Lahore Orange Line Train

The under-development Lahore Orange Line Train is Pakistan’s first between city mass fast travel prepare framework, and is one of the few tasks of China-Pakistan Economic passage (CPEC). The aggregate length of the track is 27.1 km, of which 1.7 km is underground and 25.4 km is raised at the tallness of 12 meter. The aggregate separation of 27.1 km will be secured in 45 minutes with stops on 25 stations.

In the first place, there will be 27 trains with five intruders in the every prepare. The Lahore orange line prepare is required to convey 250,000 travelers month to month. Later, it is upgraded to accomodate 500,000 travelers.

The evaluated cost of the venture is Rs.165 billion and the normal fruition date is October 2017. Exim bank of China gave $162 billion advance to the venture on ostensible loan cost. This cost likewise incorporates the cost of two matrix stations of Rs.12 billion, and the orange line prepare will utilize electric power. For the initial five years, the Lahore orange line prepare will be worked by Chinese organization, and after that it will be given over to Pakistan.

Add a Comment

Your email address will not be published. Required fields are marked *